Installation of time domain reflectometry wells (July 2009)
|
 Geoprobe hammeering of 2-3/8\" ID casing to 91\'. Video: hammering the casing
|
|
 Casing is flushed as hammering continues.
|
|
 Flushing fluids recirculated in settling tank.
|
|
 Clean water flush when drilling complete.
|
|
 Flushing of well.
|
|
 Hand-bailing of well. Video: bailing technique
|
|
 RG6/U Coleman coaxial cable and weight placed into well.
|
|
 Portland cement pumped into casing as casing is removed.
|
|
 Cement pumping system.
|
|
 Casing removed and slid off cable.
|