Installation of time domain reflectometry wells (July 2009)

\
Geoprobe hammeering of 2-3/8\" ID casing to 91\'. Video: hammering the casing

 

 

\
Casing is flushed as hammering continues.                    

 

\
Flushing fluids recirculated in settling tank.

 

 

\
Clean water flush when drilling complete.

 

\
Flushing of well.

 

 

\
Hand-bailing of well. Video: bailing technique

 

\
RG6/U Coleman coaxial cable and weight placed into well.

 

 

\
Portland cement pumped into casing as casing is removed.

 

\
Cement pumping system.

 

 

\
Casing removed and slid off cable.